Location: SeaTac, Washington This project involved construction of a new 67,000-square-foot building with classroom clusters, kindergarten rooms, a library, administrative functions, and an activities center. ORA […]
Location: Seattle, Washington This project involved a geotechnical engineering study for a proposed one-story steel-framed greenhouse building. ORA was engaged to determine the engineering properties of […]
Location: Auburn, Washington This project consisted of removal of an underground oil tank; replacement of window walls, office cabinets, and plaster pool liner; locker room remodel; […]
Location: Seattle, Washington PACCAR Hall is one of two state-of-the-art buildings developed as part of an expanded campus for the University of Washington, Michael G. Foster […]
Location: Tacoma, Washington This project involved a geotechnical engineering study for a proposed three-story, reinforced concrete building with a steel-framed roof. ORA was engaged to determine […]
Location: Tacoma, Washington This project consisted of two phases to provide additional academic space at the University of Washington Tacoma campus. Phase 3A consisted of the […]
Location: Seattle, Washington This $17 million project involved replacing the existing 30,000-square-foot shop building and a number of other modular structures at Seattle Central Community College […]
Location: Seattle, Washington This project involved replacing the existing Black River High School with a new two-story, 68,000-square-foot structure, which includes space for science labs, a […]
Location: Seattle, Washington This project consisted of the construction of a new two-story classroom building addition to the west side of the existing building, which replaced […]