Terminal 115 Berth 1 Modifications

Ingraham High School Addition & Site Improvements
April 27, 2017
Terminal 91 Berth M Reconstruction
April 27, 2017
Location: Seattle, Washington

This project involved the alteration of existing piers and constructing a new ramp into the Duwamish Waterway, including dolphins, winches, dredging, and sheet piles.

ORA’s scope of work included testing and inspection of the following:
  • Reinforcing steel
  • Reinforced concrete
  • Structural steel embedded items into concrete
  • Structural steel fabrication and erection
  • Nondestructive examination of welds