Location: SeaTac, Washington
This project involved construction of a 214-foot-long, 16-foot-wide structural steel pedestrian bridge connecting the Sound Transit Airport Station with the fourth floor of the parking garage.
ORA was engaged to provide the following inspection and materials testing services
- Soils compaction
- Structural steel fabrication and erection
- Nondestructive testing of welds
- Reinforcing steel
- Reinforced concrete