Morrison Hotel Alteration

Pantages Theater Lobby & Restrooms Remodel
May 2, 2017
Savery Hall Renovation
May 2, 2017
Location: Seattle, Washington

This estimated $21 million project involved substantial renovation, historic preservation, and seismic upgrade of an existing mixed-use building constructed in 1908.

ORA was engaged to provide the following testing and inspection services:
  • Shotcrete
  • Reinforced concrete
  • Structural steel
  • High-strength bolting
  • Seismic tie installation
  • Shearwall and diaphragm nailing
  • Installation of holdown system
  • Epoxy-grouted anchor bolt installation
  • Non-shrink grout, fireproofing
  • In-place masonry shear test
  • Pull testing