Location: Seattle, Washington
This project consisted of the construction of a new two-story classroom building addition to the west side of the existing building, which replaced the portable structures with twelve new classrooms and a central courtyard, as well as significant site improvements around the school campus.
ORA was engaged to provide testing and inspection of the following items:
- Brick veneer
- Curtain wall fabrication and erection
- Epoxy-grouted anchor bolt and rebar dowel installation
- Reinforced concrete
- Steel joist erection
- Steel seismic system (drag struts, steel canopies)
- Structural steel embedded items in concrete
- Structural steel fabrication and erection