Ingraham High School Addition & Site Improvements

Secondary Learning Center
April 27, 2017
Terminal 115 Berth 1 Modifications
April 27, 2017
Location: Seattle, Washington

This project consisted of the construction of a new two-story classroom building addition to the west side of the existing building, which replaced the portable structures with twelve new classrooms and a central courtyard, as well as significant site improvements around the school campus.

ORA was engaged to provide testing and inspection of the following items:
  • Brick veneer
  • Curtain wall fabrication and erection
  • Epoxy-grouted anchor bolt and rebar dowel installation
  • Reinforced concrete
  • Steel joist erection
  • Steel seismic system (drag struts, steel canopies)
  • Structural steel embedded items in concrete
  • Structural steel fabrication and erection