Location: SeaTac, Washington
This $33 million project involved construction of a centralized pre-conditioned air plant, associated heating and cooling piping systems, and jet bridge terminal air handling units to serve airplanes with heating and cooling while at the gates.
ORA was engaged to provide testing and inspection of the following items:
- Epoxy grouting
- Anchor bolt installation
- Reinforced concrete
- Reinforced masonry
- Pipe welding
- Structural steel
- Spray-applied fireproofing
- Soil bearing verification