Location: Auburn, Washington
This project consisted of removal of an underground oil tank; replacement of window walls, office cabinets, and plaster pool liner; locker room remodel; new water lines and ductwork; reconditioning of the pool deck and bulkhead; new code compliant pool drains; storage room and restroom addition; seismic improvements; and mechanical and electrical improvements.
ORA was engaged by the Auburn School District to provide testing and inspection services.
Geotechnical items inspected included:
- Soil compaction
- Soil bearing verification
- Subgrade evaluation
- Fill placement observation
- Fill material evaluation
Structural items inspected included:
- Reinforcing steel
- Epoxy grouting of rebar dowels
- Reinforced concrete
- Reinforced masonry
- Structural steel erection
- Steel decking