Auburn Pool

Greenhouse for Nathan Hale High School
April 27, 2017
New Business School Building – PACCAR Hall
April 27, 2017
Location: Auburn, Washington

This project consisted of removal of an underground oil tank; replacement of window walls, office cabinets, and plaster pool liner; locker room remodel; new water lines and ductwork; reconditioning of the pool deck and bulkhead; new code compliant pool drains; storage room and restroom addition; seismic improvements; and mechanical and electrical improvements.

ORA was engaged by the Auburn School District to provide testing and inspection services.

Geotechnical items inspected included:

  • Soil compaction
  • Soil bearing verification
  • Subgrade evaluation
  • Fill placement observation
  • Fill material evaluation

Structural items inspected included:

  • Reinforcing steel
  • Epoxy grouting of rebar dowels
  • Reinforced concrete
  • Reinforced masonry
  • Structural steel erection
  • Steel decking